The Alexandria Library Essay
What specific operations, tests, analyses were carried out during the process of the Library construction.
I will start from telling that the Alondra library construction site were in critical conditions and to build something in that territory it was nearly impossible. So, a lot of operations tests, and analyses were made during the process of the Library construction to improve the conditions. So, one of the first operations on construction site was incorporating reinforced-concrete walls into the construction to account for the lateral loading (,, Reinforced-concrete walls were incorporated into the construction to account for the lateral loading associated with wind and earthquakes.”) Also a lot of operations was made on ground complex to improve the ground conditions, example: extensive foundation and ground engineering work, including excavation ,dewatering , bored piles and jet grouting improvements (,,Because of the critical ground conditions, the complex has required extensive foundation and ground engineering work, including excavation, dewatering, bored piles, and jet grouting improvements.